htmlstart dam . April 30 - Dam maintenance desilting the reservoir
jpg 20170430_0007 . 1 BC EB Tons of water
jpg 20170428_0003 . 1 BC EB Lots of rocks and gravel washed down over the winter
jpg 20170430_0006 . 1 BC EB Moving gravel to the outflow to send it downstream
jpg 20170430_0004 . 1 BC EB Peter wielding the hoe
jpg 20170430_0009 . 1 BC EB All clean. Putting stopper board over drain pipe so it can be capped.
ver
jpg 20170430_0012 . 1 BC EB Capping the upper 6" drain pipe
jpg 20170430_0013 . 1 BC EB Job done. Neighbor's valve partially open.
jpg 20170430_0014 . 1 BC EB Nice dam