htmlstart grid 2004 Boat Grid Project - May - July 2004 txt The grid serves as a temporary dry dock. Place the boat over the grid at high tide
at low tide the boat is high and dry for repairs or maintenance. hdr May 2004 - Material for Grid jpg 040527_02 2004 1 BC EB Cu. yd. of concrete aggregate
delivered by Marine Link jpg 040527_03 2004 1 BC EB Five sacks concrete, rebar hdr July 2004 - Building the grid jpg 040702_04 2004 1 BC SI Hauling the concrete mixer to Edna Bay jpg 040703_23 2004 1 BC EB Mixer ready to go down the beach steps jpg 040703_24 2004 1 BC EB Whew! We made it jpg 040703_25 2004 1 BC EB Mixer positioned for pouring jpg 040703_26 2004 1 BC EB Mixer positioned for pouring jpg 040703_29 2004 1 BC EB Five sacks cement and a cubic yard of aggregate jpg 040703_30 2004 1 BC EB Peter helping homogenize the mix
We lowered aggregate and cement in buckets jpg 040703_31 2004 1 BC EB Mixer hoisted out of the tide's way jpg 040704_35 2004 1 BC EB Two more forms built-
pier block to weigh them down when the tide comes in jpg 040705_01 2004 1 BC EB The forms floated up and dumped the pier block.
It wasn't enough weight. jpg 040705_02 2004 1 BC EB Another view jpg 040705_03 2004 1 BC EB The crane used to hoist the mixer out of the tide's way jpg 040705_04 2004 1 BC EB Peter with a bucket of aggregate jpg 040705_05 2004 1 BC EB We rigged a chute for getting aggregate to the mixer -
easier than lowering it in the bucket jpg 040705_06 2004 1 BC EB Funnel into the chute jpg 040705_07 2004 1 BC EB Looking down the chute jpg 040705_08 2004 1 BC EB Chuting aggregate to the mixer jpg 040705_09 2004 1 BC EB Mixing - the camera lady about to get sprayed jpg 040705_12 2004 1 BC EB Finishing the surface jpg 040705_13 2004 1 BC EB Grid poured jpg 040705_14 2004 1 BC EB Mixer being winched up the steps jpg 040706_03 2004 1 BC EB Grid beams from the wharf jpg 040709_01 2004 1 BC EB Mixer on its way back to Sea Lion Rock Lodge jpg 040713_02 2004 1 BC EB 7/13/04: Forms removed and side bracing installed jpg 040713_06 2004 1 BC EB 7/13/04, 2:40PM: Middle wall awash
at 10.5' tide.
Note 2X6 surface boards installed. htmlend