July - Building a grid for working on boats

040702_04.jpg
Stuart Island, BC - 2004
Hauling the concrete mixer to Edna Bay

040703_23.jpg
Edna Bay, BC - 2004
Mixer ready to go down the beach steps

040703_24.jpg
Edna Bay, BC - 2004
Whew! We made it

040703_25.jpg
Edna Bay, BC - 2004
Mixer positioned for pouring

040703_26.jpg
Edna Bay, BC - 2004
Mixer positioned for pouring

040703_29.jpg
Edna Bay, BC - 2004
Five sacks cement and a cubic yard of aggregate

040703_30.jpg
Edna Bay, BC - 2004
Peter helping homogenize the mix
We lowered aggregate and cement in buckets

040703_31.jpg
Edna Bay, BC - 2004
Mixer hoisted out of the tide's way

040704_35.jpg
Edna Bay, BC - 2004
Two more forms built-
pier block to weigh them down when the tide comes in

040705_01.jpg
Edna Bay, BC - 2004
The forms floated up and dumped the pier block.
It wasn't enough weight.

040705_02.jpg
Edna Bay, BC - 2004
Another view

040705_03.jpg
Edna Bay, BC - 2004
The crane used to hoist the mixer out of the tide's way

040705_04.jpg
Edna Bay, BC - 2004
Peter with a bucket of aggregate

040705_05.jpg
Edna Bay, BC - 2004
We rigged a chute for getting aggregate to the mixer -
easier than lowering it in the bucket

040705_06.jpg
Edna Bay, BC - 2004
Funnel into the chute

040705_07.jpg
Edna Bay, BC - 2004
Looking down the chute

040705_08.jpg
Edna Bay, BC - 2004
Chuting aggregate to the mixer

040705_09.jpg
Edna Bay, BC - 2004
Mixing - the camera lady about to get sprayed

040705_12.jpg
Edna Bay, BC - 2004
Finishing the surface

040705_13.jpg
Edna Bay, BC - 2004
Grid poured

040705_14.jpg
Edna Bay, BC - 2004
Mixer being winched up the steps

040706_03.jpg
Edna Bay, BC - 2004
Grid beams from the wharf

040709_01.jpg
Edna Bay, BC - 2004
Mixer on its way back to Sea Lion Rock Lodge

040713_02.jpg
Edna Bay, BC - 2004
7/13/04: Forms removed and side bracing installed

040713_06.jpg
Edna Bay, BC - 2004
7/13/04, 2:40PM: Middle wall awash
at 10.5' tide.
Note 2X6 surface boards installed.